POWER SECTOR PROJECTS

Sondu Miriu Hydro-Electric Power Station – 2 X 30 MW
Employer:                                 Kenya Electricity Generation Co. Ltd, (KENGEN), Kenya.
Consulting Engineer:              Nippon Koei Company
Sub-Contract with:                   Konoike – Taisei Joint Venture
Construction Period:                 January 2005 – March 2007
Value:                                       US$ 17.3 Million
Construction of 2 x 30 MW Sondu-Miriu Hydro Electric Power Station including the construction of 11 km long permanent access road. Major works include

  • Open-cut excavation and concrete works for steel penstock line (approximately 1,180 metres long)
  • Open-cut excavation for and construction of powerhouse building of reinforced concrete.

                                                                                          

 

 

 

Reinforcement of the Power House

 


 

 

 

 

Installation of spiral casting in the power house

                                                                                                

  Page 12
  PREVIOUS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 NEXT PAGE
           

 
© H Young & Co, (EA) Ltd,
Funzi Road, Industrial Area,
P.O Box 30118 Nairobi , Kenya.
Telephone: 530145/6, 530147/8/9, 530150/2
Fax: 531056, 530151
E-mail: hyoung@hyoung.co.ke
Website: http://www.hyoung.com         Credits
To Page Top