Mumias Sugar 380 TCH Expansion Project
ClientMumias Sugar Co. Ltd.
Supervising EngineerBosch Projects (PTY) Ltd. RSA
Completion dateJuly 2005
Project ValueUS$ 3.4 Million









A brown field project that increased the production Mumias Sugar factory production capacity from 340 tons of cane to 380 tons of cane produced per hour.

Works included:
  • Installation of a 4,000m2 Kestner type Evaporator which is the largest ever installed in Kenya.
  • Supply and installation of Pressure vessels including 345m3 Continuous Vertical Crystallizer and 1,100m2 Massecuite Re-heater.
  • Installation of 4 Nos BMA Type "A" Sugar Centrifugal Station with an additional provision of a future 5th Centrifugal.
  • Electrical and instrumentation works including installation of 3.3 KVA Transformer and Switch gears.
  • Civil and building works including 384 m of piles for foundation works,
  • Mechanical and structural steel erection on site


 
 