| Client | South Nyanza Sugar Company Ltd. |
|---|
| Supervising Engineer | Ilove Sugar Company, South Africa |
|---|
| Completion date | 1998 |
|---|
| Project Value | KES 131 Million (US$ 1.8 Million) |
|---|
|
Phase 1
Works comprised of design, excavation and execution of New Foundation for an extended Cane yard, Floors etc. In addition H Young was involved in the design , excavation and execution of new foundation of Hydra Unloaders, M.C.C., A.C.C. and Feed Tables and retaining walls for the sugar cane
Phase 2
Works comprised of design, execution of 2 Cane Knife bases for installation of Heavy Duty Reverse Rotation Knives. The salient point of this work was that a preparatory support structure was installed under the MCC prior to shut down in order to enable civil works to start during the factory operation. Over 3,000 m3 of class 30 concrete were cast in 2 lifts only.
|