| Client | Mumias Sugar Co. Ltd. |
|---|
| Supervising Engineer | Avant-Garde Engineers & Consultants |
|---|
| Completion date | January 2009 |
|---|
| Project Value | US$ 8.5 Million |
|---|
|
Civil works for 35 MW bagasse based cogeneration project.
Main works include:
- Construction of steam turbo generator foundations and power house, boiler, auxiliaries ESP and duct supports a switchyard, water treatment plant, water system pumps and tanks, cooling towers, conveyor foundations, bagasse storage shed, pipe rack and steel chimney.
- Piling works - 20 No. (each 1.05m Diameter)
- Earth works - 14,085m3
- Concrete works - 7,800m3
- Structural Steel works - 160 tons
|