Hyoung  
Search 
  Home     About Us     Operating Divisions     Markets     Media     CSR     Careers     Contacts  
  Markets  
  Telecommunications
 
  Mining
 
  Power Generation
 
  Petroleum Industry
 
  Agro processing Industry
 
  Port and Marine
 
  Roads
 
   
   
   
   
   
   
   
   
   
   
  Cement Manufacturing
 
  Buildings
 
Home >> Markets >> Roads >> Meru - Mikinduri - Maua
Construction Of Meru - Mikinduri - Maua (D484) Roads.
ClientMinistry of Roads & Public Works, Kenya
Supervising EngineerChief Engineer, Roads
Completion dateAugust 2009
Project ValueKES 1.843 BILLION (US$ 27.3 Million)









The Project roads are approximately 52 km long in total and are located in Meru District, Eastern province primarily involved construction of a new road to bitumen standard.

The project road traversing through a terrain that is predominantly hilly in a rich agricultural hinterland which is heavily populated. The road crosses a swamp that was reclaimed.

Major works executed comprised mainly of:
  • Construction of Earthworks - 1,594,000 m3
  • Cement stabilized sub-base and base - 175,000 m3
  • Provision of a double surface dressing using 14/20mm and 6/10mm pre-coated class 4 chippings for both the carriageway and shoulder - 16,000m3
  • Construction of pipe culverts, bridges, box culverts and other drainage works.
  • Protection works using stone pitching and gabions
  • Provision of road furniture including road marking and traffic signs

 
 
© 2008 H Young & Co, (EA) Ltd  
Search    |    Sitemap    |    Privacy Policy    |   
Web Design by: Dotsavvy Ltd