Machakos Turnoff - Masii
ClientMinistry of Roads & Public Works, Kenya
Supervising EngineerChief Engineer, Roads
Completion dateSeptember 2008
Project ValueKES 1.302 BILLION (US$ 18.6 Million)









The Machakos Turnoff – Masii lies to the south east of Nairobi. For the purpose of rehabilitation the project was divided into four sections with the total project length being 78 km.

Section 1 involved complete reconstruction involving removal of the existing bitumen and stabilized layers as well as widening the carriageway by 1.5m.
Section 2 - 4 involved repairing of failed pavement layers and resealing of the road

Major works executed comprised mainly of:
  • Construction of Earthworks ------------------------------- 387,000 m3
  • Cement stabilized sub-base and base ------------------- 74,000 m3
  • Application of 50mm of Asphalt Concrete type 1 & 2----- 17,900m3
  • Construction of pipe culverts, bridges, box culverts and other drainage works.
  • Protection works using stone pitching and gabions
  • Provision of road furniture including road marking and traffic signs

 
 