| Client | Mitsubishi Heavy Industries & Mitsubishi Corporation Joint Venture |
|---|
| Engineer | Mott Ewbank Preece, UK |
|---|
| Completion date | 1999 |
|---|
| Project Value | US$ 21.72 Million |
|---|
|
Construction of a 60MW (6 x 10MW) diesel power station in Mombasa.
Civil & Building works including 3 storied power station building, heavy duty foundations for the turbines generators and an office building.
Civil works undertaken included:
- Earthworks - 158,000m3
- Concrete works - 15,600m3
- Heavy duty concrete block paving for the access road - 24,000m2
- Other works: Supply and installation of structural steel works including
- Heavy duty Over Head Carnage.
- HDO Tanks (2 X 9,000m3)
- 8 No. tanks with total capacity of 24,000m3 of various media including fire water, raw water, potable water, oil and lubrication oils.
Sewerage and drainage works also undertaken.
The project highlight was the construction of a 50 metre chimney for flew gases using the slip form technique.
|