| Client | Kenya Ports Authority |
|---|
| Supervising Engineer | J. O. Associates |
|---|
| Completion date | 2003 |
|---|
| Project Value | US$ 1.2 Million |
|---|
|
Supply and installation of fire fighting system for oil offloading jetties at Kipevu and Shimanzi oil terminals. Works included the installation of fire water pipelines, concrete lined MS pipeline of 1200Lm, foam lines and diesel lines for the fire pumps and generator sets.
|