| Client | Kenya Ports Authority |
|---|
| Supervising Engineer | Chief Engineer, Kenya Ports Authority |
|---|
| Completion date | 2004 |
|---|
| Project Value | US$ 1.2 Million |
|---|
|
The project involved demolishing of the existing concrete surface of the container terminal and repaving it with heavy duty paving blocks. Other works included removal of damaged gratings and replacing the same with news upper heavy duty gratings as well as the rehabilitation of the drainage system.
Heavy duty paving blocks - 6,200m2
Concrete works - 2,200m3
Rolled asphalt works - 2,055m2
Placement of Super Heavy duty Gratings - 1,025m2
|