| Client | Kenya Pipeline Company Ltd. |
|---|
| Supervising Engineer | PENSPEN |
|---|
| Completion date | 2002 |
|---|
| Project Value | US$ 1.8 Million |
|---|
|
Rehabilitation of Petroleum Storage Tanks at Mombasa, Nairobi, Nakuru, Eldoret and Kisumu terminals. Other works included
- Installation of Foam Nitrogen Deluge System.
- Installation of tank gauging/ conductivity and control system.
- Repairs and painting of tank 1901 & modifications to existing pipe work manifolds for tanks TK1901 & TK 1903, repairs to floating roof, linear welding on floating roof, replacement of foam dam.
- Supply and installation of pipe fittings and motor operated valves.
|