| Client | Mumias Sugar Co. Ltd. |
|---|
| Supervising Engineer | Bosch Projects (PTY) Ltd. RSA |
|---|
| Completion date | July 2005 |
|---|
| Project Value | US$ 3.4 Million |
|---|
|
A brown field project that increased the production Mumias Sugar factory production capacity from 340 tons of cane to 380 tons of cane produced per hour.
Works included:
- Installation of a 4,000m2 Kestner type Evaporator which is the largest ever installed in Kenya.
- Supply and installation of Pressure vessels including 345m3 Continuous Vertical Crystallizer and 1,100m2 Massecuite Re-heater.
- Installation of 4 Nos BMA Type "A" Sugar Centrifugal Station with an additional provision of a future 5th Centrifugal.
- Electrical and instrumentation works including installation of 3.3 KVA Transformer and Switch gears.
- Civil and building works including 384 m of piles for foundation works,
- Mechanical and structural steel erection on site
Mumias Sugar 380 TCH Expansion Project (2007)
| Client | Mumias Sugar Co. Ltd. |
|---|
| Supervising Engineer | Bosch Projects (PTY) Ltd. RSA |
|---|
| Completion date | April 2007 |
|---|
| Project Value | US$ 3.14 Million |
|---|
|
A brown field project that increased the capacity of the process house.
Works included:
- Fabrication of 100m3 "C" Continuous Vacuum Pan
- Fabrication of 1400 dia Rain type Condenser
- Fabrication of 55 tons per hour Raw Sugar Drier.
- Electrical and instrumentation works including installation a new MCC equipment for the process house and installation of 1,600 kVA Transformer and Switch gears.
- Civil and building works including 384 piles for foundation works
|