Construction of Sondu Miriu Hydro Electric Power Project

Client:                         KONOIKE – TAISEI JV.

Engineer:                    Nippon Koei

Completion Date:          Expected March 2007

Value:                           Ksh 1.26 Billion (US$ 17.3 Million)

Construction of 2x30MW Sondu-Miriu Hydro Electric Power Station including the construction of 11 Kms long permanent access road in different .
Opencut excavation and concrete works for the steel penstock line (appr. 1,180m long)

Opencut excavation for and construction of powerhouse building of reinforced concrete (40m length, 24.5m width and 32.1m in height)

Excavation and concrete lining of outlet channel (appr. 4,700m)

 
Excavation Works on Penstock Line

 

 
Excavation & Concrete Works for the penstock Line.

  Page 1    
1 2 3 4 5 6 7 8 9 10 NEXT PAGE
           

 
© H Young & Co, (EA) Ltd,
Funzi Road, Industrial Area,
P.O Box 30118 Nairobi , Kenya.
Telephone: 530145/6, 530147/8/9, 530150/2
Fax: 531056, 530151
E-mail: hyoung@hyoung.co.ke
Website: http://www.hyoung.com         Credits
To Page Top